Friday, 24 February 2012

week 4 & week 5 :-)

for this two weeks, the schedule for my fyp is;
  • Do a research about project features
~ i have did a research about my project.. about GPS.. GPS is stand for Global Positioning Sytem.. to determine the precise location of a vehicle, person, or other asset to which it is attached and to record the position of the asset at regular intervals. it may be transmitted to a central location data base, or internet-connected computer, using a GPRS or SMS, radio, or satellite modem embedded in the unit. ~ this is a GPS tracking unit Architecture.~
GPS Architecture






other things that i have did in these two weeks is; 
  • prepared my project's proposal. 
 ~ i did the introduction 1st. for the introduction, i have told about what is an overall features of GPS, and also highlight what is the purpose of my project. ~

Thursday, 9 February 2012

week 2 & week 3 :-)

~~assalamualaikum w.b.t.. we meet again.. for this entry, i want review what was happens in a week 2 and week 3.. all of this is about my FyP ^_^.  for this two weeks, the things is;

  • Comfirm the project's title with my supervisor..
~ when i have meet my SV (stands for supervisor), he gave me a title that ' A Development Model Of Wind Tunnel'.. everything was there.. a features of the project, equipment used, circuit, block diagram, and so on.. but... because i cannot access to my rps (very pity for wifi bmi...), that's title was taken by other student.. huhu.. only ALLAH knows how was my feeling on that time.. :-(



#see.. all information was given..huhu



~ my SV gave me a new title.. thanks a lot sir.. my new title is 'A Development Of GPS Mobility Tracking System'.. this is project's description.. #It should designed and developed locally to allow vehicle owners to determine how to navigate and track real time vehicles at any one time.# ~

p/s: after this, when i want to access my rps account, need to borrow a broadband from someone.. huhu